References

Tufanbeyli

Review and analyze the latest status of the Plant’s three CFB boilers / Flue Gas Desulphurization units. Calculation model of thermal and flue gas flow characteristics. Optimization thermal model according boiler & FGD data performance and operation data. Assessment of operational conditions at the flue gas path refractory locations and possible impact into the refractory lifetime – identification of critical design features based on the thermal calculation model outcomes. Boiler design input data for flue gas path refractory adaptation. Boiler design input data for flue gas path heat surfaces adaptation against corrosion and erosion. Identification of critical heat surfaces design features based on the thermal calculation model outcomes. Balancing output data on fuel flow, fly ash flow and flue gas flow based on input fuel quality

Aras Edas

Project development, engineering, procurement of equipment, field implementation of various locations, data collection and analysis for interpretation, project management

Boreas

Investor / Construction / Commercial Operation

Hamitabat

2×6000 m3 fuel oil storage tanks, unloading systems, forwarding systems, electrification, automation, fire extinguisher and fuel oil heating systems. Double Fuel System Mechanical & Electrical Erection

Afşin Elbistan B

Raw water supply system, including 2x32km of raw water handling line, pump house, water intake structures.

Manisa OSB

TurnKey Construction, Erection & Commissioning

Çan

Cooling Water System Mechanical & Electrical Erection

Bursa

HVAC, mechanical erection works, water treatment system

Van I-II

Investor/ EPC / Commissioning / Commercial Operation